首页 社会内容详情
环球ug平台卖分(www.ugbet.us)_DNeX unit takes delivery of FPSO from Teekay

环球ug平台卖分(www.ugbet.us)_DNeX unit takes delivery of FPSO from Teekay

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

环球ug平台卖分www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

,DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the group anticipates full operational deployment of the FPSO on the Avalon field development project in the North Sea by 2025.

PETALING JAYA: Dagang Nexchange Bhd’s (DNeX) subsidiary Ping Petroleum UK PLC has taken delivery of the Sevan Hummingbird floating production, storage and offloading (FPSO) vessel from marine energy transportation company, Teekay Corp.

DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the group anticipates full operational deployment of the FPSO on the Avalon field development project in the North Sea by 2025.

“We have a tangible asset ready with the newly acquired Sevan Hummingbird. Our next step is to secure approval for our field development plan, which will be submitted in the coming months,” he said yesterday.

Ping has received a “no objection” letter from the North Sea Transition Authority in March and was then granted a 19-month extension from the authority to the second term of the P2006 licence containing the Avalon field.

“The proposed development concept includes plans to deploy the Sevan Hummingbird FPSO at the Avalon field which will be modified to facilitate electrification from an external, low-carbon source,” DNeX said.

Ping is also evaluating options to connect the FPSO to a dedicated floating offshore wind turbine to power the facility which will help minimise diesel usage and associated greenhouse gas emissions.

The planned development allows Ping to expand and diversify its portfolio of producing assets in full compliance with the United Kingdom’s energy security and net-zero targets.

Commissioned in 2008, the Sevan Hummingbird FPSO is a 60 metre-diameter facility with a storage capacity of 270,000 barrels of oil and is capable of producing up to 30,000 barrels of oil per day, supporting up to 47 offshore personnel.

With a total estimated ultimate recovery of 23 million barrels of oil reserves over a period of 12 years, oil production from Avalon, Ping’s second oilfield asset, is expected to come onstream in 2025.


转载说明:本文转载自Sunbet。
  • USDT手机钱包(www.usdt8.vip) @回复Ta

    2022-07-13 14:05:03 

    当小编走入古镇之中发觉青木川尽管没有非常大,占地总面积仅有10000平米,可是少数民族氛围都萃取在这个小小国家级别4A古镇之中了,没有被过多商业化的,我们可以在古镇之中见到青石砖水流、亭台楼榭。古镇上保存着很多的古街、古祠、古悬空栈道,而且大部分是在明清时期基本建设出来得。一条宽阔的河堤围绕着全部古镇,我们在远方能将本地葱翠的峰峦一览无遗,走入古镇却又能见到不一样的“小溪流水”风韵。有没有水友一起

发布评论